  • Forsmark site investigation Sampling and analyses of ...

    Borehole KFM03A is the third telescopic borehole drilled at the site investigations in the Forsmark area. The location of the borehole, which is currently being drilled, is shown in Figure 1-1. The borehole is planned to be c. 1000 m deep, and the borehole section 0–100 m is percussion drilled. During drilling, the groundwater yield from this

    Get Price
  • Oskarshamn site investigation Percussion drilling of ...

    Percussion drilling to depths of 151.8 m was done in both holes to investigate the inter-preted lineaments and related geophysical anomalies. This report will describe the drilling of percussion boreholes HLX34 and HLX35 that were drilled to investigate interpreted lineaments. Measurements performed during the drilling

    Get Price
  • Drilling and Test Pumping Report for One Borehole at ...

    2020-4-27 · borehole at Omauni PHC clinic in the Ohangwena region. The borehole was drilled by Green Team Drilling Company with application of Mud Rotary drilling method. 1.2 Objectives The report elaborates on the drilling and test pumping of borehole WW204779 drilled at Omauni clinic. The report further elaborates on the water analysis and

    Get Price
  • FINAL REPORT ON THE DRILLING, PUMP TESTING AND

    2015-8-20 · Z:GEOMEASURE 20142014-252 RHDHV Emergency BH IlembeReportDrilling etc Report2015-04-10 Final Ozwathini & Nhlangakazi Drilling Report.docx Based on the analysis of the pump test data, borehole KZN150049 is capable of producing a sustainable yield of 51.84 kl/day (6.48 m3/hour on an 8 hour pump cycle).

    Get Price
  • Borehole Survey Report - JICA

    2014-7-18 · Borehole Survey Report 1. Test Drilling Results 1.1 Purpose and Method of the Survey Test borehole drilling was conducted at six (6) target sites (R1Muhasuwa, R2Mwatibu, R3Chimwalira, R4Kabekere, R5Mwalawanyenje, and R6Mzoma) to check the availability of a groundwater source which is necessary for the construction of water supply facilities.

    Get Price
  • Deliverable 3: Progress report on the confirmed borehole ...

    2018-5-15 · 5. Sampling of Chief Mamili’s Borehole in the Bamunu Conservancy The borehole (WW 201625) has been drilled to a depth of 165m, which, if correctly deducted from the borehole completion report has been drilled into the Lower Aquifer from 117-165m. The yield of the boreholes was 13 m3/h, and it was installed at a pumping rate of 3m3/h. The ...

    Get Price
  • WARMA Form: G1 BOREHOLE COMPLETION REPORT

    2018-7-22 · Bottleset: sample Anions: 250 mL PE LNAPL/DNAPL/BTEX: 20°mL headspace. 20 mL sample Cations: 100 mL PE, 0.45 µm filtrated + 1 % HNO 3 ccsp 2 acidified TIC/TOC: 40 mL glass, Al-septum cap, bubblefree Microbiology: 100 ml PE, sealed, 110 ml sample

    Get Price
  • Borehole Drilling Planning, Contracting & Management

    2018-11-28 · the different steps of planning, contracting and managing borehole drilling projects. It is the hope of the writers that it will increase the quality, efficiency and effectiveness of drilling programmes and clarify areas where specific expertise is required.

    Get Price
  • Forsmark site investigation - Sampling and analyses of ...

    included for the last sample collected from each borehole. Total organic carbon (TOC) was mainly determined in order to investigate the suitability of the boreholes as sources for flushing water. 5.2 Sample treatment and chemical analyses An overview of sample treatment and analysis routines is given in Appendix 1. The routines are

    Get Price
  • BOREHOLE RECORDS AND COMPLETION REPORTS |

    2015-7-15 · Location of borehole or well, matched to the initial geophysical survey 3. Dates of construction, name and roles of all those involved 4. The depths and types of drilling methods used 5. Penetration times and static water level 6. Drilled diameters, position of screen and casing 7. Position and size of gravel pack, depth of seal, 8.

    Get Price
  • Oskarshamn site investigation Percussion drilling of ...

    When the drilling was completed the hole was rinsed from drill cuttings by blowing air with the compressor at maximum capacity for 30 minutes. Figure 4-2. Drilling rig and crew drilling percussion borehole HLX34 in the north-western part of the Laxemar subarea.

    Get Price
  • Drilling and Completion Report Sample |

    2017-11-1 · The daily drilling report also suggests that much of the time was spent on drilling. I suggest a contingency cost estimation approach for this project, with the main aim of including all the unpredictable risks in the budgeting process. References. Samuel O. Osisanya, (2016) Notes on horizontal well drilling and Completions

    Get Price
  • TECHNICAL REVIEW : BOREHOLE DRILLING AND

    2016-10-19 · 5.1.2 Compressed air rotary drilling 46 5.2 Borehole logging 49 6 Borehole design, development, and completion 53 6.1 Borehole construction design 54 6.1.1 Borehole casing 54 6.1.2 Borehole well screens 55 6.1.3 Gravel pack 58 6.1.4 Pump selection 62 6.1.5 Sealing the borehole 62 6.1.6 Examples of borehole design 64

    Get Price
  • ESTABLISHMENT OF BOREHOLE DRILLING PROJECT FOR

    2019-2-8 · establishment of borehole drilling project for sustainable water supply for economic developmentat isyesye village, itezi ward, mbeya city council, mbeya elias manyama a dissertation submitted in partial fulfillment for the requirements for the degreee of master in community economic development of the open university of tanzania 2018

    Get Price
  • GUNGNIR RESOURCES INC. TECHNICAL REPORT on the

    2021-2-18 · Sweden Ni-Cu Properties Resource Estimates November 2020 v 1 EXECUTIVE SUMMARY Gungnir Resources Inc. (“Gungnir”) has requested that Reddick Consulting Inc. (“RCI”) prepare a Technical Report on the Lappvattnet and Rormyrberget (“Ror”) nickel-copper-cobalt deposits located in Sweden. The report is to support the release of mineral

    Get Price
  • STATEMENT OF WORKS REHABILITATION OF A

    2020-5-12 · approval a sample of each respective material or product and such samples shall be delivered to and kept by him for reference. All the respective types of materials and products used in the works shall be at least equal in quality to the approved samples. Each and every sample shall be a fair average of the bulk material or of

    Get Price
  • Supervising Water Well Drilling - pS-Eau

    2012-12-6 · borehole drilling is to ensure that bore-holes are produced as designed and all the data collected during the drilling are accurately recorded and reported to the relevant agencies. Good supervision is essential for a high quality bore-hole, even if a competent drilling contractor (henceforth referred to as the ‘Driller’) is employed.

    Get Price
  • Water Well Drilling Agreement Example - Alberta

    2019-10-25 · See Water Well Drilling Report at the back of module as an example of what you will get from the drilling contractor. It is important to get a good original pump test on the well. This provides a base condition to which the condition of the well can be compared as it 'ages.' 300 mm (12') Plastic Schedule 40 PVC

    Get Price
  • Assessment of the functionality of hand-pump boreholes ...

    2014-10-1 · No random sampling method was used for the assessment. Getting a representative sample would be difficult as too many variables are involved including, amongst others, type of underlying geology, implementing NGO, age of borehole, type of contract used for the drilling, drilling …

    Get Price
  • Soil sampling the safety of a dam -

    2019-4-30 · Soil sampling the safety of a dam. Sonic drilling is being used in an increasingly diverse range of applications and one recent example of this expansion in the use of the technique is the dam safety project in Sweden where it was used by Vattenfall. A sonic drill rig mounted on a CAT 336-F modified excavator was used to take samples at a dam ...

    Get Price
  • COSC-1 operational report - Operational data sets

    This operational report concerns the first drill hole, COSC-1 (ICDP 5054-1-A), drilled from early May to late August 2014. COSC-1 is located in the vicinity of the abandoned Fröå mine, close to the town of Åre in Jämtland, Sweden and was planned to sample a thick section of the Seve Nappe and to penetrate its basal thrust zone into the ...

    Get Price
  • Operational report about phase 1 of the Collisional ...

    During various stages of the drilling, the borehole was documented by comprehensive downhole logging. This operational report pro‐ vides an overview over the COSC‐1 operations from drilling preparations to the sampling party and describes the available datasets and sample material.

    Get Price
  • Deep Borehole Field Test Research Activities at

    2016-8-19 · The U.S. Department of Energy (DOE) has embarked on the Deep Borehole Field Test (DBFT), which will investigate whether conditions suitable for disposal of radioactive waste can be found at a depth of up to 5 km in the earth’s crust. As planned, the DBFT will demonstrate drilling and construction of two boreholes, one for initial scientific ...

    Get Price
  • Water | Free Full-Text | Striving for Borehole Drilling ...

    Drilled boreholes are vital to achieving universal, safe drinking water and meeting Sustainable Development Goal (SDG) 6.1, particularly in Africa. Poor quality siting, borehole design, drilling and completion lead to premature failure of the water supply. From 2004 to 2020, a multi-stakeholder initiative through the Rural Water Supply Network (RWSN) has endeavored to raise the professionalism ...

    Get Price
  • ICDP Status and Future

    2021-2-9 · ICDP also supports post- drilling workshops after - completion of the operative work and basic core and sample description for e.g. discussing of initial results and organizing individual sampling. Over the past years, ICDP supported the conduction of workshops with a broad topical spectrum addressing various future drilling projects.

    Get Price
  • Borehole breakouts and stress fields - ScienceDirect

    1989-7-1 · The applications include borehole instability during drilling, completion related problems like sanding or hydraulic fracturing, and eventually hydrocarbon production from fractured reservoirs [I,2]. Among several available methods to access the in situ stress state, the analysis of borehole breakouts gives a relatively inexpensive set of data.

    Get Price
  • HAJXY& ALDRICH TEST BORING REPORT Boring

    2019-2-19 · HALEY& TEST BORING REPORT ALDRICH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase NOTE: Borehole filled with bentonite chips upon completion. 0 Open End Rod T Thin Wall Tube U Undisturbed Sample TY pe Inside Diameter (in.) Hammer Weight (lb.;~ Hammer Fall (in.)

    Get Price
  • 600m Borehole Drill Truck Mounted Rotary Water

    600m Truck Mounted Underground Water Drilling M, Underground Water Drilling Machine, Underground Water Drilling Rig manufacturer supplier in China, offering 600m Borehole Drill Truck Mounted Rotary Water Drilling Rig, Well Drilling Rig Portable for Sale, Deep Well Drilling Rig Machine Core Geological Drill Equipment and so on.

    Get Price
  • Application of Measurement While Drilling

    2019-10-9 · A tunnelling project is normally initiated with a site investigation to determine the in situ rock mass conditions and to generate the basis for the tunnel design and rock support. However, since site investigations often are based on limited information (surface mapping, geophysical profiles, few bore holes, etc.), the estimation of the rock mass conditions may contain inaccuracies, resulting ...

    Get Price
  • DRILLING AND TEST PUMPING OF ONE BOREHOLE IN

    2020-6-24 · DRILLING AND TEST PUMPING OF ONE BOREHOLE IN KAYUNGA Borehole Completion Report December 2018 TGS 201840 TGS Water Ltd Borehole Drilling, Water Supplies &Construction Management Osman Road, plot 12, Lira Municipality- Lake Drive, plot 21, Luzira, Kampala P.O.Box 37461, Kampala-Uganda 0772-222049/10, 0312-265130 E-mail:[email protected]

    Get Price
  • GEOTECHNICAL INVESTIGATION REPORT

    2018-6-22 · Boring drilling up to 15.0m depth below N.G.L or refusal. Conducting standard penetration test (SPT) & Collection of undisturbed sample (UDS) at the locations prefixed by the Engineer-in-charge. Observation of the depth of water table in the Borehole.

    Get Price
  • Borehole and Water Well Drilling - British Geological Survey

    2006-10-10 · Borehole and Water Well Drilling Page and any additional information will be be welcomed where available. Completed records (in electronic format where available) should be sent to the GSNI as soon as possible after completion of drilling. If required, upon written request, arrangements can be made to keep information confidential. Sample ...

    Get Price
  • HAJXY& ALDRICH TEST BORING REPORT Boring

    2019-2-19 · HALEY& TEST BORING REPORT ALDRICH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase NOTE: Borehole filled with bentonite chips upon completion. 0 Open End Rod T Thin Wall Tube U Undisturbed Sample TY pe Inside Diameter (in.) Hammer Weight (lb.;~ Hammer Fall (in.)

    Get Price
  • Evaluation of the Lund deep geothermal exploration

    2019-4-5 · The bedrock of Skåne, the southernmost province of Sweden, has been targeted for geothermal feasibility studies since the late 1970s. An exploration project concerning the geothermal potential in the Romeleåsen Fault Zone was launched outside the town of Lund in 2001. Besides geophysical imaging of the thrust fault zone, the investigations included drilling and investigations of a …

    Get Price
  • COSC-1 operational report - Operational data sets

    This operational report concerns the first drill hole, COSC-1 (ICDP 5054-1-A), drilled from early May to late August 2014. COSC-1 is located in the vicinity of the abandoned Fröå mine, close to the town of Åre in Jämtland, Sweden and was planned to sample a thick section of the Seve Nappe and to penetrate its basal thrust zone into the ...

    Get Price
  • SITE INVESTIGATION REPORT PROPOSED

    9631/OT Site Investigation Report – 129 Blenheim Crescent, London W11 2EQ Client: Fiona Murphy & Anatole Kaletsky Engineers: Fluid Structures 14 August 2014 [Rev 0] APPENDIX A Fieldwork, in-situ testing and monitoring Window sample borehole records

    Get Price
  • Operational report about phase 1 of the Collisional ...

    During various stages of the drilling, the borehole was documented by comprehensive downhole logging. This operational report pro‐ vides an overview over the COSC‐1 operations from drilling preparations to the sampling party and describes the available datasets and sample material.

    Get Price
  • Image log analysis of in situ stress orientation,

    2017-4-11 · The borehole was drilled with 5 to 15°C drilling fluid, and subsequent logging has indicated that the formation temperature at the base of the borehole is ~55°C [Lorenz et al., 2015]. Image logs in COSC‐1 from 2014 were acquired by using a Robertson …

    Get Price
  • Perspectives for development of ice drilling

    Three drilling methods can be considered to achieve this: (1) section drilling (the borehole is drilled in ‘stepping down’ mode – once the predetermined depth is reached, a small-diameter borehole is continued); (2) drilling with intermittent reaming; and (3) reaming while drilling.

    Get Price
  • Forsmark site investigation Geophysical borehole

    Geophysical borehole logging has been performed in borehole KFM01D situated in Forsmark, Sweden. The objective of the survey is to determine the physical properties of the rock mass around the borehole, e.g. to determine rock types and quantify the fracture frequency and …

    Get Price
  • Drilling, Logging, and Testing Information from Borehole ...

    2011-1-12 · Drilling, Logging, and Testing Information from Borehole UE-25 UZ#16, Yucca Mountain, Nevada by Falah Thamir,1 William Thordarson,1 Jack Kume,1 Joseph Rousseau,1 Roy Long,2 and Donald M. Cunningham, Jr.3 1 U.S. Geological Survey, Yucca Mountain Project Branch, Denver, CO P ^ U.S. Department of Energy, Las Vegas, NV

    Get Price
  • REQUISITION SITING DRILLING AND TESTING OF

    2010-10-18 · report that needs to be forwarded to the Steve Tshwete Local Municipality (3 hardcopies and 1 electronic copy). The report must include sitting, drilling and aquifer testing results as well as WASP analysis. 7. Borehole Protection The borehole will have a 750mm diameter and 1,0m high concrete ROCLA manhole ring and lid placed on it.

    Get Price
  • Geotechnical Investigation Report

    2017-12-4 · The borehole record depicts conditions at a particular location and at the particular time indicated. Subsurface soil and groundwater conditions at locations away from the borehole could vary from those indicated on the borehole logs. In general, the subsurface soil profile encount ered in the borehole consists of a surficial layer of

    Get Price
  • APPLICATION FOR BOREHOLE DRILLING PERMIT (FORM E)

    2017-5-13 · APPLICATION FOR BOREHOLE DRILLING PERMIT (FORM E) To be completed in duplicate (2) BOREHOLE COMPLETION REPORT WATER POINT INFORMATION 1. IDENTIFICATION AND LOCATION DATA Type of water point: Borehole Dug well Augured shallow well

    Get Price
  • ENVIRONMENTAL IMPACT ASSESSMENT (EIA) PROJECT

    2016-7-14 · EIA report for the Proposed Borehole at Tabani RC Primary School May 2014 . iii . EXECUTIVE SUMMARY . Introduction The purpose of Environmental Impact Assessment (EIA) is to identify potential positive and negative environmental impacts associated with proposed borehole development project as

    Get Price
  • PROCEEDINGS OF THE PROGRAM - Ocean Drilling

    2007-1-23 · The Ocean Drilling Program, an international activity, operates a specially equipped deep-sea drilling ship, the JOIDES Resolution (Sedco/BP471), which contains state-of-the-art laboratories, equipment, and computers. The ship is 471 feet (144 meters) long, is 70 feet (21 meters) wide, and has a displacement of 18,600 short tons.

    Get Price
  • Borehole Log: Free Templates | SafetyCulture

    2012-1-12 · According to an ADF (2005) report, the Millennium Development Goals (MDG) objective of Ethiopia is to increase the improved water sources coverage from 2004 levels of 25% water supply and 8% sanitation to 62% for water supply and 54% sanitation by 2015. As a consequence, governmental and nongovernmental

    Get Price
  • ASSESSMENT OF DRINKING WATER QUALITY AND

    2019-10-9 · A tunnelling project is normally initiated with a site investigation to determine the in situ rock mass conditions and to generate the basis for the tunnel design and rock support. However, since site investigations often are based on limited information (surface mapping, geophysical profiles, few bore holes, etc.), the estimation of the rock mass conditions may contain inaccuracies, resulting ...

    Get Price